Atlantic Basin Greenway Segment 0.58 linear miles
This greenway segment is currently adopted
Segment Description
Summit Street between Van Brunt Street & Imlay Street
9’ wide north sidewalk
10’ wide 2-way path adjacent to sidewalk
3’ buffer
Imlay Street between Summit Street & Verona Street
10’ wide west sidewalk
8’ wide 2-way bike path adjacent to sidewalk
3’ buffer
Imlay Street between Verona Street & Pioneer Street
14’ wide west sidewalk
14’ wide 2-way off street bike path adjacent to sidewalk
Pioneer Street between Imlay Street & Conover Street
16’ wide sidewalk
14’ wide 2-wayoff-street bike path adjacent to sidewalk
Conover Street between Pioneer Street & King Street
16’ wide sidewalk
8’ wide 2-way bike path adjacent to sidewalk
3’ buffer
Conover Street between King Street & Sullivan Street
12’ wide sidewalk
5’ wide 1 way bike lane adjacent to sidewalk
Stewardship of this segment includes
The sidewalk and two-way bike path, on the north side of Summit Street and the west side of Imlay Street and Conover Street, from fence line to the buffer.
The two-way, off-street bike path adjacent to the Brooklyn Cruise Terminal.
All traffic control devices and street furniture present along this path, and landscaping features that are not maintained by adjacent residences or property owners.
Segment Specific Considerations
The on-street portion of this greenway is accessible by DSNY street cleaning and snow removal.
Access to snow removal equipment will be necessary to clear the path through Atlantic Basin of snow or ice.