Kent Avenue South, Brooklyn Waterfront Greenway 0.95 linear miles
This greenway segment is currently adopted.
Segment Description
Kent Avenue between South 5th Street & Clymer Avenue
10’ wide west sidewalk
8' wide parking protected 2-way bike lane, adjacent to sidewalk
Kent Avenue between Clymer Street and Williamsburg Street West
17’ wide west sidewalk
8' wide protected 2-way bike lane, adjacent to sidewalk
2’ wide buffer separating bike lane from vehicular traffic
Maintenance of this segment includes:
The west sidewalk from property line or fence line to the curb, the adjacent bike lanes and, where present, the buffer. All traffic control devices and street furniture present along this path, and landscaping features that are not maintained by adjacent residences or property owners.
Segment Specific Considerations
Overgrowth of vegetation passes through from portions of this segment bordered by fence and presents potential obstruction of the path. This should be trimmed to the fence line as necessary.
The on-street portion of this greenway is accessible by DSNY street cleaning. Snow removal may be required in the parking protected bike lanes.