Bruckner Boulevard I, Bronx River Greenway 0.4 linear miles
Segment Description
Bruckner Expresssway between Edgewater Road & Whitlock Avenue
11’ wide north bridge sidewalk
10’ wide 2-way path adjacent to sidewalk
Longfellow Avenue between Aldus Street & Whitlock Avenue
12' wide west sidewalk and tree beds
5' bike lane
1,050 sqft planted tree bed, at Whitlock Avenue and Longfellow Avenue
Whitlock Avenue between Aldus Street & Bruckner Boulevard
12' wide east sidewalk, connected tree beds and greenspace adjacent to Sheridan Expressway
Bruckner Boulevard between between Whitlock Avenue & Bryant Avenue
12’ wide west sidewalk and tree beds
10’ wide, 2-way bike lanes, protected from the adjacent vehicle lane by concrete barriers
Bruckner Boulevard between between Bryant Avenue & Hunts Point Avenue
12’ wide west sidewalk and tree beds
Shared use lane adjacent to sidewalkMaintenance of this segment includes
Sidewalks and tree beds
and bicycle routes, on the north side of Summit Street and the west side of Imlay Street and Conover Street, from fence line to the buffer.
The two-way, concrete barrier protected bike lanes along Bruckner Boulevard.
All traffic control devices present along this path, and landscaping features that are not maintained by adjacent residences or property owners.
Segment Specific Considerations
The on-street portion of this greenway is accessible by DSNY street cleaning and snow removal.
Access to snow removal equipment will be necessary to clear the bridge sidewalk of snow or ice.
The irregular tree bed at Whitlock Avenue and Longfellow Avenue, and the greenspace adjacent to Sheridan Expressway may be planted.